The Woodinville-Duvall Road Widening Project involves
the widening of NE Woodinville-Duvall Road from 156th
Avenue NE to the east City limits at 171st Place NE.
The existing two-lane roadway will be widened to three-lanes
to provide an additional center turn lane and improved
sidewalks and bike lanes. Other improvements will include
drainage improvements, traffic signal improvements, street
lighting, and landscape improvements. The overall length
of the project is approximately 1.1 miles. The primary
purpose of the project is to improve safety and to relieve
traffic congestion.
For
more details about the design schedule, please see
the attached
preliminary schedule.
Project Update
Design of the Woodinville-Duvall Road Widening project
began in June of 2009. The first community meeting
was held in September 2009. The final selection
by the City Council of the preferred roadway section
(shown below) occurred in April 2010. The project
is now at a 60% design level and design is expected
to be completed in spring 2011. Utility relocations
are scheduled to begin in summer 2011, but may
start later. The actual construction of the project
has not yet been funded. The City is actively looking
to secure funding. Construction of the project
can start soon after funding is obtained.
COMMUNITY MEETING NO. 2
Wednesday, December 8,
2010, 6 PM - 8 PM
At this community meeting the design team will present
the proposed improvements including details of
the proposed walls, landscaping, and street lighting.
City staff and the design team will be available
to answer your questions and to listen to your
ideas and concerns. Woodinville Water and Sewer
District and Puget Sound Energy will also be available
to answer questions regarding their utility relocations/improvements
associated with the project. The format of the
meeting will be open house style, so drop by anytime
during the meeting time.
On April 13, 2010 the City Council selected this design.

October
9, 2009: There are several different roadway
section designs that the City is considering during
the design of the Woodinville Duvall roadway. At
the Community Meeting regarding the Woodinville Duvall
Road design, held on September 17 , these roadway
section design illustrations were displayed for the
public to view and provide comment to staff and designers.
The following link includes the roadway section designs
that were displayed at the Community Meeting. Roadway
Section Design
If you would like to provide input on these design
options, please fill out the attached survey and mail
it to the City of Woodinville , Attn: RAchel Speer,
Assistant Public Works Director, 17301 133 rd Ave NE
, Woodinville , WA 98072 . Questionaire
Community Meeting No. 1: Thursday, September 17th,
2009.
The City will host its first Community Meeting regarding
the Woodinville-Duvall Road Widening Project on Thursday,
September 17th , 2009 at the Wellington Elementary
School Gymnasium, 16501 NE 195th St., Woodinville,
WA from 6:00 to 8:00 pm. The design team will introduce
the project and illustrate a range of roadway section
alternatives that are being considered. The alternatives
range from a narrow rural section to a wider urban
section, complete with curb, gutter, sidewalks, and
bicycle lanes. City staff and the design team will
be available to answer your questions and to listen
to your ideas and concerns. The format of the meeting
will be open house style, so drop by anytime during
the meeting time. Input provided by you at this first
meeting will help us select a preferred roadway alternative
for the project. View the complete
announcement document.
May 19, 2009 : City Council awarded a $697,441
contract to Otak to complete design of the Woodinville-Duvall
Road Widening Project.
City Contact: Rachel Speer, Assistant Public Works Director, 425.489.2700,
ext. 2294